The penetration schedule identifies some penetrations for “electricity connection.” On which sheet(s) is/are additional information about the wall penetrations located? Locate the callouts that reference these penetrations on the foundation floor plan. Provide the grid location for these callouts.
a. A-202
b. A-102
c. E-101
d. E-103