contestada

If the predetermined overhead rate is 200% of direct labor cost and if direct labor cost is estimated to be $512,000, which of the following amounts is equal to $1,024,000?
a) Total overhead cost.
b) Total production cost.
c) Total labor cost.
d) Total manufacturing cost.