The ABC Company uses a standard data system to set time standards. One of the time
study analysts listed the three work elements for a new task to be performed in the shop
and then determined the normal time values to be 0.73 min, 2.56 min, and 1.01 min. The
company uses a PFD allowance factor of 16%. Determine the standard time for the task.