Which of the following statements apply to statistical process control (SPC)?
A) It is used to monitor and control a process to ensure it operates at its full potential.
B) It involves using statistical techniques to measure and analyze the variation in a process.
C) It helps identify and eliminate the causes of variation in a process.
D) All of the above