A tower crane has a hoist motor rated at 163 hp. If the crane is limited to using 67.0% of its maximum hoisting power for safety reasons, what is the shortest time in which the crane can lift a 5750 kg load over a distance of 79.0 m? Assume the load is lifted at a constant velocity.