An electric potential difference of 10,00 V is applied to a 4.5 x 10^-3 C test charge. How much work is done on the test charge?

Respuesta :

Answer:

The work done on the test charge is 4.5 joules

Explanation:

It is given that,

Electric potential difference, [tex]V=1000\ V[/tex]

Charged particle, [tex]q=4.5\times 10^{-3}\ C[/tex]

Work done on the test charge is given by the product of test charge and potential difference i.e.

W = q × V

[tex]W=4.5\times 10^{-3}\ C\times 1000\ V[/tex]

W = 4.5 Joules

So, the work done on the test charge is 4.5 joules. Hence, this is the required solution.