Answer:
Consider the following calculations
Explanation:
Answer a.
Delivery Cycle Time = 33.0 days
Throughput Time = 15.0 days
Delivery Cycle Time = Throughput Time + Wait Time
33.0 = 15.0 + Wait Time
Wait Time = 18.0 days
Answer b.
MCE = 0.32
Throughput Time = 15.0 days
MCE = Process Time / Throughput Time
0.32 = Process Time / 15.0
Process Time = 4.80 days
Answer c.
Throughput Time = Process Time + Inspection Time + Move Time + Queue Time
15.0 = 4.80 + Inspection Time + 0.4 + 7.0
Inspection Time = 2.8 days