Respuesta :
Answer:
a. What are the maximum and minimum cycle times?
The maximum cycle time is 60 minutes and the minimum cycle time is 2.4 minutes.
b. How much daily output will be achieved by each of those cycle times?
Daily output = CT = A/R
For max CT = 480/60 = 8 units per day
For min CT = 480/2.4 = 200 units per day.
2. In problem 1, suppose the line is balanced using 14 workstations and a finished product can be produced every 4.5 minutes.
a. What is the production rate in units per day?
CT = A/R or 4.5 = 480/R or R = 106.66 units/day
b. What is the assembly-line efficiency?
Efficiency = 60/[4.5(14)] =0.95 or 95.2% percent efficiency.
1.a. maximum and minimum cycle times are 60 and 2.4 minutes.
1.b. 200 units per day.
2. a. 106.66 units/day
2. b. 95.2% percent efficiency.
What is the Maximum cycle time?
1. a. When The maximum cycle time is 60 minutes and also the minimum cycle time is 2.4 minutes.
b. Then the daily output will be achieved by each of those cycle times 2 Then the Daily output is = CT = A/R
Then For max CT is = 480/60 = 8 units per day
Therefore, For min CT is = 480/2.4 = 200 units per day.
2. a. When The production rate in units per day CT is = A/R or 4.5 = 480/R or R is = 106.66 units/day
b. Then The assembly-line Efficiency is = 60/[4.5(14)] =0.95 or 95.2% percent efficiency.
Find more information about Maximum cycle time here:
https://brainly.com/question/22079572