Respuesta :

Answer:

see below

Step-by-step explanation:

The cost is the flat fee of 5200 plus the amount per ton

C = 5200 + 200S

Let S =0

Then C = 5200

Let S = 1

C = 5200+200 = 5400

Ver imagen wegnerkolmp2741o

Answer:

C = 5200 + 200S

Draw a straight line (only in the first quadrant) connecting the following two points:

(0, 5200)

(10, 7200)