Answer:
133.33%
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = Total overhead cost ÷ direct labor cost
where,
Total overhead cost is $200,000
And, the direct labor cost is $150,000
Now placing these values to the above formula
So, the predetermined overhead rate is
= $200,000 ÷ $150,000
= 1.33%
We simply applied the above formula