Answer:
The required rate of return for the project will be 13.087%
Explanation:
To calculate the required rate of return for the project, we must first calculate the required rate of return for the firm's equity. The required rate of return can be calculated using the CAPM or Capital Asset Pricing Model equation. The formula for required rate of return (r) under this model is,
r = rRf + Beta * rpM
Where,
r = 0.027 + 1.23 * 0.069
r = 0.11187 or 11.187%
The discount rate that is usually used for an all equity firm is its required rate of return. Thus, the required rate of return for the project will be,
r = 0.11187 + 0.019
r = 0.13087 or 13.087%