Now consider machining jamming caused by both defective parts jamming and station malfunction. Assume component lot quality is at the level of 1/4 percent defective, what is the production rate? Can the production quota of 2,500 units per eight-hour shift be met? What is the percent downtime? What is the efficiency of this line? What is the throughput time?