For productivity to increase 1. the total production or output has to increase. 2. the total number of hours worked has to increase 3. the value of the production per hour worked has to increase.​

Respuesta :

Answer:

. the value of the production per hour worked has to increase.​

Explanation:

Productivity is a measure of output generated from per unit of input. It is a measure of the efficiency of a machine, worker, system, or factory in converting inputs to desired outputs. Productivity is calculated by dividing the average output per period by the incurred input (labor, time, capital, material, energy).

For productivity to increase, the value of production per hour has to increase. The output per hour has to increase compared to the input used.