Answer:
Predetermined manufacturing overhead rate= $76.27 per machine hour
Explanation:
Giving the following information:
Thomlin Company forecasts that total overhead for the current year will be $11,898,000 with 156,000 total machine hours.
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 11,898,000 / 156,000
Predetermined manufacturing overhead rate= $76.27 per machine hour