The master budget of Marigold Corp. shows that the planned activity level for next year is expected to be 50000 machine hours. At this level of activity, the following manufacturing overhead costs are expected:
Indirect labor $800000
Machine supplies 250000
Indirect materials 250000
Depreciation on factory building 70000
Total manufacturing overhead $1370000
A flexible budget for a level of activity of 60000 machine hours would show total manufacturing overhead costs of :_________.
a. $1630000
b. $1370000.
c. $1644000.
d. $1574000.