Respuesta :

Answer:

The correct answer will be "-1.66".

Step-by-step explanation:

Let z₀ be,

[tex]P(z<z_0)=4.8 \ percent[/tex]

                [tex]=0.048[/tex]

⇒ [tex]\Phi (z_0)=0.048[/tex]

Now,

⇒ [tex]\Phi (-1.6646)=0.048[/tex]

   [tex]z_0=-1.6646[/tex]

       [tex]\simeq -1.66[/tex]

Thus the above is the right answer.