Answer:
The correct answer will be "-1.66".
Step-by-step explanation:
Let z₀ be,
[tex]P(z<z_0)=4.8 \ percent[/tex]
[tex]=0.048[/tex]
⇒ [tex]\Phi (z_0)=0.048[/tex]
Now,
⇒ [tex]\Phi (-1.6646)=0.048[/tex]
[tex]z_0=-1.6646[/tex]
[tex]\simeq -1.66[/tex]
Thus the above is the right answer.