Material requirements planning is simply used for the management of manufacturing processes.
The main aim of the materials requirement planning is that it helps in keeping production activities on track. Also, there's better inventory control and an improvement in scheduling.
Based on the options given, the true statements about materials requirements planning include:
• It is used widely, especially in manufacturing.
• It is considered a push system.
• It uses a time-phased schedule that is based on lead time.
Read related link on:
https://brainly.com/question/12678676