this would mean so muchto me i just need 4 left but need help with this


McDonald's


PRODUCTION

What raw materials they need to buy (ingredients):

What capital the need to buy or lease/upgrade with the changes made (equipment, machinery, furniture):

Who they need to hire (description of the different types of workers and the number of each):

Type of Worker:
-
-
-

Description of Job:
-
-
-

Number Required Per Shift:
-
-
-