Work done by a force is given as the product of force and the distance moved by the force.
Work done is the product of force and the distance moved by the the force.
Thus, distance required by the 100 N force is given as:
Distance = 1000/100 = 10 m
Distance to be moved is 10 m.
Force applied = work done/ distance
Force applied by the hoist = 500/2
Force applied by the hoist = 250 N
Distance moved in one push-up = 25 cm = 0.25 m
Work done by the athlete after one push-up = 250 × 0.25 m
Work done by the athlete = 62.5 J
Distance moved by the force = 0 m
Work done = 500 × 0 = 0 N
Therefore, for work to be done, force has to move a distance.
Learn more about work done at: https://brainly.com/question/25573309