The eight wastes of traditional operations include all of the following except Question content area bottom Part 1 A. defects. B. overproduction. C. waiting. D. utilizing people to their full potential.

Respuesta :

The answer is utilizing people to their full potential.

Push-type systems are used in conventional industrial processes. They are predicated on the idea that it is preferable to predict and prepare for potential production requirements in the future. Traditional methods manufacture commodities ahead of time so that they are available when demand arises.

Eight wastes are:

1. Defects

2. Overproduction

3. Waiting

4. Not utilizing people to their full potential

5. Transportation

6. Inventory

7. Movement

8. Excess processing.

Therefore The eight wastes of traditional operations includes all of the following except "utilizing people to their full potential"

Hence option D utilizing people to their full potential is correct.

To know more about eight wastes click here:

https://brainly.com/question/13909059

#SPJ4