Respuesta :

Kanban (pull) Scheduling is a scheduling system that builds output in response to actual customer demand.

What is Kanban (pull) Scheduling ?

  • The Kanban pull system enables Just in Time production by coordinating the material and information flow of disjointed operations. The process of managing the flow of resources through a system is called a pull system.
  • A visual workflow management method called kanban scheduling was developed to maximize productivity and inventory. The Kanban system was created by an industrial engineer at Toyota Automotive to aid the corporation in precisely determining the proper quantity, timing, and production method.
  • Top 5 characteristics of Kanban:Improvement in workflow, Limiting Work-In-Progress, Continuous Delivery.,Pull Approach,Visual metrics.

To learn more about Kanban pull system visit:

https://brainly.com/question/27960583

#SPJ4