Tenisha is leading a new project for her design and engineering company, planning and building several large, connected residential areas
sharing water and power needs. Her company tried and failed to receive LEED certification for a previous project involving the construction of a new sports arena. The project was completed for the client, but not in a way that met LEED standards. Tenisha is determined to seek
certification for her project and succeed. How can she best plan to make this happen?
O Study the specific failures of the previous project and try to avoid repeating those errors.
O Assign an engineer she trusts to work closely with the construction company to ensure LEED compliance.
O Study and plan to meet the requirements of every LEED category relevant to her project.
O Tackle one area at a time and learn from any failures with respect to LEED standards when starting on the next