santana corporation manufactures snowmobiles in its blue mountain, wisconsin, plant. the following costs are budgeted for the first quarter’s operations.

Respuesta :

The classification of the budgeted costs into their activity cost pools is as follows:

Engineering

Engineering design $140,000

Engineering prototypes $60,000

Machinery

Insurance, plant $110,000

Depreciation, machinery $520,000

Oil, heating $19,000

Depreciation, plant $210,000

Machine setup

Machine setup, indirect materials $4,000

Machine setup, indirect labor $20,000

Quality control

Inspections $16,000

Tests $4,000

Factory utilities

Electricity, plant lighting $21,000

Property taxes $29,000

Electricity, machinery $36,000

Maintenance

Machine maintenance wages $19,000

What are activity cost pools?

Activity cost pools are the major classifications of production activity costs into their cost drivers to make it easier to estimate costs according to the activity that consumed them.

The use of activity cost pools enables activity-based costing to be implemented.

Learn more about activity cost pools at https://brainly.com/question/18121193

#SPJ1

Question Completion:

Machine setup, indirect materials $4,000

Inspections $16,000

Tests $4,000

Insurance, plant $110,000

Engineering design $140,000

Depreciation, machinery $520,000

Machine setup, indirect labor $20,000

Property taxes $29,000

Oil, heating $19,000

Electricity, plant lighting $21,000

Engineering prototypes $60,000

Depreciation, plant $210,000

Electricity, machinery $36,000

Machine maintenance wages $19,000

Classify the above costs of Santana Corporation into activity cost pools using the following: engineering, machinery, machine setup, quality control, factory utilities, and maintenance.