the capacity of a process is determined by multiple choice the bottleneck. the maximum of the required capacity resources. throughput time. none of these choices are correct.

Respuesta :

The capacity of a process is determined by throughput time.

What is throughput time?

A manufacturer's process time, inspection time, move time, and wait time are all included in the throughput time, also known as cycle time. Lean manufacturing techniques, such as the just-in-time inventory system, have become more popular among manufacturers during the past 20 years. These manufacturers depend on production efficiency and work to shorten the time it takes to produce a good. Throughput time is a manufacturing metric that lean firms use to measure their productivity. The four manufacturing process steps—process time, inspection time, move time, and wait time—are added to determine the throughput time for a product formula.

To learn more about throughput time, visit:

https://brainly.com/question/16931356

#SPJ4