A requirement of two-resource sequencing rule is that:a. all jobs must begin at the same timeb. each job must be processed first on the first resource and the on the second.c. a maximum of two jobs can be processed at a time on each resourced. total processing time must be minimized

Respuesta :

A requirement of Johnson's two-resource sequencing rule is that jobs must be processed through each work center in the same job stream.

In operations research,Johnson's rule is a method of scheduling jobs at two work centers. Eight sequencing rules have been considered Shortest Imminent processing time,earliest due date,dynamic least slack,Least Work in Next Queue,First In, first out,last in last out,critical ratio, and LS least slack.the job that arrives at the workstation first has the highest priority,shortest processing time.A priority sequencing rule that specifies that the job that requires the shortest processing time is the next job to process. DNA sequencing is the process of determining the sequence of nucleotides As,Ts,Cs,and Gs in a piece of DNA.In Sanger sequencing, the target DNA is copied many times,forming fragments of different lengths.

To learn more about sequencing please click on below link.

https://brainly.com/question/29806715.

#SPJ4