Answer:
Dr Work in Process $382,500.00
Cr Direct Materials Quantity Variance $15,937.50
Cr Materials $366,562.50
Explanation:
Preparation of the Journal tentry to record the standard direct materials used in production
Dr Work in Process $382,500.00
(8,500 × 6 × $7.50)
Cr Direct Materials Quantity Variance $15,937.50
[(48,875 – 51,000) × $7.50]
Cr Materials $366,562.50
(48,875 × $7.50)
(To record the standard direct materials used in production)